Scarabeo 8

The aim of the project was to design new elevated deck for six new winches (winch deck) onboard Scarabeo 8 semi-submersible drilling rig.
The set of equipment istalled on the deck is as follows:
• 3 x Future Production winches for operating the wellcenter
• 3 x sub-sea winches (1 x work winch of SWL 12t and 2 x guide winches of SWL 6t each) from Seaonic.
Due to its location in fwd-port side of the moonpool, planning of the layout of the winch deck was challenging. In addition to the winch deck design we have also worked with the design of the winches sheaves and new access service decks platforms to help with the maintenances of the sheaves installed under the rig structures.

Key facts:
• Dimensions : L 14 [m] x W 6.8 [m] x H 4.8[m]
• Deck equipped with heavy duty bumpers
• Deck equipped with staircase
• Delivered: 2023