West Elara / Valemon hook-up

NAVIC Engineering delivered the project in all phases: from the concept through the executive design of a route between the Valemon platform and West Elara drilling rig, owned by Seadrill.

Within the scope of work NAVIC performed:
• Design of stairs from the main deck to staircase
• Design of stair tower
• Design of gangway from stair tower to the deck on Valemon
• Design and calculation of all connection points on rig
• Design of spreader beams for lifting stair tower and all lifting arrangement
• Installation management

Delivered: 2011